BLINN BOARD APPROVES CONSTRUCTION ITEMS FOR BRYAN, RELLIS CAMPUSES
The Blinn Board of Trustees authorized the College today (Tuesday) to name a construction manager at risk for the Bryan Campus Administration Building and purchase computer equipment for the Administration Building at RELLIS.
College administrators recommended that the board allow for the negotiation and execution of a contract with J.T. Vaughn Construction, LLC, for construction manager at risk services related to the Bryan Campus Administration Building. The $30.95 million project includes an approximately 45,000-square-foot facility at the location of the former Rivergate Church on Villa Maria Road.
The building will house Blinn’s bookstore, police department and administrative offices, as well as student services currently located in the Central Administrative Services Building at the Tejas Shopping Center, including academic advising, enrollment services and financial aid. Additionally, Blinn plans to extend Nash Street to create a new campus entrance with an accompanying monument sign and demolish the existing adjacent structures.
Construction will begin this summer, and the building is expected to be ready for occupation in fall 2023.
The board also authorized the College to move forward with a contract with Dell for computer equipment for the RELLIS Campus Administration Building. Scheduled to open for the fall 2022 semester, the three-story, 80,000-square-foot facility will be located north of the Walter C. Schwartz Building.
The facility will feature an engineering lab, computer science classroom, information technology lab, esports arena, student services suite, 19 lecture classrooms, study spaces, faculty and administrative suites, and meeting rooms. The project also includes faculty/staff and visitor parking, sidewalks, pedestrian lighting, a circular entry drive and a plaza.
Also at today’s meeting, the board received a preliminary enrollment report for the 2021 winter minimester and the 2022 spring semester.
