TxDOT TO FIX SAGGING FLYOVER

  

Work is set to begin on repairs to a sagging flyover on Highway 290 in Brenham.

Soil settlement on the FM 577 flyover has resulted in a portion to drop several inches.

TxDOT resident engineer Mark Shafer says it’s a settlement of the embankment on either side of the bridge – not any kind of problem with the bridge itself.

A private contractor has been hired by TxDOT to level the flyover, which would entail the injection of a foam-like substance that expands and raises with the concrete.

The flyover was part of improvements on Highway 290 completed several years ago.

 

What’s your Reaction?
+1
0
+1
0
+1
0